Case Study - ECS Engineering Services Ltd
WIF member, ECS Engineering Services Ltd installed a rotary sluice and control system at Elton
|
Project |
Location |
Client |
Value |
|
Main Contractor |
Elton Sluice
|
EA Anglian Region |
£156,000 |
|
Nature of Brief |
Installed quadrant gate and Rotork operating system to replace obsolete control gate and associated electrics/control system. |
||
|
Completion/Evidence of success |
Completed June 2008. The original wooden structure was in a state of disrepair. A new radial gate structure has greatly increased the efficiency of the sluice gate. |
||