Case Study - Peter Duffy Limited

WIF member, Peter Duffy Ltd is replacing a fire hydrant main for British Energy


Details: Contract value £350k

Peter Duffy Limited is carrying out the replacement of the existing fire hydrant main on the Eggborough site for British Energy. This involves the installation of 1300m x 250mm od HDPE butt fusion pipeline, the removal of the existing ABS fire hydrant main and the installation of new fire hydrants, valves and associated chambers. All work is being undertaken during normal working hours with no impact on the station operations or interruption to services on the site.

Peter Duffy Limited are a member of the Water Industry Forum. For more details on Peter Duffy Limited including contact details, please click here.

« Go Back

Back to top

Find a Supplier

Search Our Database

Got a water or waste water problem on your site?

Search Tip: instead of entering full questions such as "I have a problem with my drains", try to refine your search and enter relevant keyphrases such as "drainage, drains, blockage".

A specialist deliverer of

This Business Collaboration Network is funded by
Yorkshire Forward as part of the Solutions for Business portfolio.