Case Study - ECS Engineering Services Ltd
Sluice gate and operation system replaced by WIF member, ECS Engineering Services Ltd
|
Project |
Location |
Client |
Value |
|
Main Contractor |
Tempsford |
EA Anglian Region |
£197,385 |
|
Nature of Brief |
Replaced the overstructure and installed a balanced sluice gate system utilising a counterweight and providing new power supply and operating system. |
||
|
Completion/Evidence of success |
Completed August 2008. This has mechanised a manual system for lifting and lowering the gate with a powered balanced installation. This has greatly improved efficiency and control of this structure. |
||